{"id":48421,"date":"2023-01-01T07:10:13","date_gmt":"2023-01-01T06:10:13","guid":{"rendered":"https:\/\/movilex.es\/proyectos\/dismantling-of-vegenat-freeze-dried-production-line\/"},"modified":"2026-02-26T09:34:55","modified_gmt":"2026-02-26T08:34:55","slug":"dismantling-of-vegenat-freeze-dried-production-line","status":"publish","type":"proyectos","link":"https:\/\/movilex.es\/en\/proyectos\/dismantling-of-vegenat-freeze-dried-production-line\/","title":{"rendered":"Dismantling of VEGENAT freeze-dried production line"},"content":{"rendered":"\n<figure class=\"wp-block-image size-medium\"><img fetchpriority=\"high\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-300x169.jpg\" alt=\"\" class=\"wp-image-47065\" srcset=\"https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-300x169.jpg 300w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-1024x576.jpg 1024w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-768x432.jpg 768w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-1536x864.jpg 1536w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-370x208.jpg 370w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-1290x725.jpg 1290w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-840x473.jpg 840w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-410x231.jpg 410w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-600x338.jpg 600w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat-270x152.jpg 270w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/vegenat.jpg 1920w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\"><strong>Spain<\/strong><\/h2>\n\n<p>Comprehensive dismantling of the <strong>freeze-drying line<\/strong> at the <strong>Vegenat<\/strong> plant, located in <strong>Guadiana del Caudillo (Spain)<\/strong>.<\/p>\n\n<p>The project was carried out under <strong>deadlines defined by the client<\/strong>, with Movilex having a <strong>30-day execution period<\/strong>. The intervention involved <strong>high technical complexity<\/strong>, due to the <strong>presence of ammonia installations<\/strong> and the <strong>simultaneous coordination of multiple contractors<\/strong> on site.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Main functions and responsibilities of Movilex<\/strong><\/h3>\n\n<p>During the dismantling, <strong>ferrous materials<\/strong>, <strong>aluminium-copper<\/strong>, <strong>stainless steel<\/strong>, <strong>electric motors<\/strong>, <strong>electrical panels<\/strong>, <strong>boilers<\/strong>, and other industrial equipment were recovered.<\/p>\n\n<p>The <strong>majority of the recovered material was sold to local companies<\/strong>, promoting the reuse and recovery of resources.<\/p>\n\n<p>Movilex also managed <strong>hazardous waste<\/strong>, including <strong>ammonia decontamination<\/strong>, <strong>gases from HVAC systems<\/strong>, <strong>noise-reduction blankets<\/strong>, and <strong>ceramic dust<\/strong> present in the process booths, ensuring treatment in accordance with current regulations.<\/p>\n","protected":false},"featured_media":0,"template":"","class_list":["post-48421","proyectos","type-proyectos","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/proyectos\/48421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:attachment":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/media?parent=48421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}