{"id":48423,"date":"2021-12-01T07:08:16","date_gmt":"2021-12-01T06:08:16","guid":{"rendered":"https:\/\/movilex.es\/proyectos\/dismantling-of-the-bsh-priming-line\/"},"modified":"2026-02-26T12:19:49","modified_gmt":"2026-02-26T11:19:49","slug":"dismantling-of-the-bsh-priming-line","status":"publish","type":"proyectos","link":"https:\/\/movilex.es\/en\/proyectos\/dismantling-of-the-bsh-priming-line\/","title":{"rendered":"Dismantling of the BSH priming line"},"content":{"rendered":"\n<figure class=\"wp-block-image size-medium\"><img fetchpriority=\"high\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-300x169.jpg\" alt=\"\" class=\"wp-image-47069\" srcset=\"https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-300x169.jpg 300w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-1024x576.jpg 1024w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-768x432.jpg 768w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-1536x864.jpg 1536w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-370x208.jpg 370w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-1290x725.jpg 1290w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-840x473.jpg 840w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-410x231.jpg 410w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-600x338.jpg 600w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh-270x152.jpg 270w, https:\/\/movilex.es\/wp-content\/uploads\/2023\/05\/bsh.jpg 1920w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\"><strong>Spain<\/strong><\/h2>\n\n<p>Comprehensive dismantling of the <strong>priming line<\/strong> at the <strong>BSH<\/strong> plant in <strong>Zaragoza<\/strong>.<\/p>\n\n<p>The project had <strong>very demanding deadlines set by BSH<\/strong>. Movilex had <strong>9 days<\/strong> to fully carry out the dismantling, a job that was ultimately completed in <strong>6 days<\/strong>, thanks to the team\u2019s <strong>planning, experience, and professionalism<\/strong>. <\/p>\n\n<p>This early completion of the deadlines represented a <strong>distinctive result compared to other dismantling companies involved in the project<\/strong>, none of which met the established targets.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Main functions and responsibilities of Movilex<\/strong><\/h3>\n\n<p>During the dismantling, <strong>ferrous materials<\/strong>, <strong>aluminium-copper<\/strong>, <strong>stainless steel<\/strong>, <strong>electric motors<\/strong>, <strong>electrical panels<\/strong>, <strong>boilers<\/strong>, and other industrial equipment were recovered.<\/p>\n\n<p><strong>Most of the recovered material was sold to local companies<\/strong>, supporting the local circular economy.<\/p>\n\n<p>Movilex also managed <strong>hazardous waste<\/strong>, including <strong>gas decontamination from air-conditioning equipment<\/strong>, <strong>noise-reduction blankets<\/strong>, and the <strong>ceramic dust<\/strong> present in the priming booths, ensuring it was treated in accordance with current regulations.<\/p>\n","protected":false},"featured_media":0,"template":"","class_list":["post-48423","proyectos","type-proyectos","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/proyectos\/48423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:attachment":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/media?parent=48423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}