{"id":48436,"date":"2015-01-01T06:34:30","date_gmt":"2015-01-01T05:34:30","guid":{"rendered":"https:\/\/movilex.es\/proyectos\/panama-canal\/"},"modified":"2026-02-26T12:34:16","modified_gmt":"2026-02-26T11:34:16","slug":"panama-canal","status":"publish","type":"proyectos","link":"https:\/\/movilex.es\/en\/proyectos\/panama-canal\/","title":{"rendered":"Panama Canal"},"content":{"rendered":"\n<figure class=\"wp-block-image size-medium\"><img fetchpriority=\"high\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-300x169.jpg\" alt=\"\" class=\"wp-image-47071\" srcset=\"https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-300x169.jpg 300w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-1024x576.jpg 1024w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-768x432.jpg 768w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-1536x864.jpg 1536w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-370x208.jpg 370w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-1290x725.jpg 1290w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-840x473.jpg 840w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-410x231.jpg 410w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-600x338.jpg 600w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama-270x152.jpg 270w, https:\/\/movilex.es\/wp-content\/uploads\/2024\/05\/panama.jpg 1920w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Panama<\/h2>\n\n<p>During the expansion of the <strong>Panama Canal<\/strong> locks, various industrial wastes were generated, including ferrous material, wood, plastics, and end-of-life tires. The latter were delivered to authorized waste managers for proper treatment. <\/p>\n\n<p><strong>Movilex<\/strong> participated in this project, contributing its expertise in comprehensive industrial waste management.<\/p>\n\n<h3 class=\"wp-block-heading\">Main functions and responsibilities of Movilex<\/h3>\n\n<p>Movilex was responsible for the <strong>removal, storage, and decontamination<\/strong> of all material discarded during the expansion, on both the <strong>Atlantic<\/strong> and <strong>Pacific<\/strong> sides.<\/p>\n\n<p>For the development of the production process, Movilex leased <strong>two industrial warehouses<\/strong>, one located in <strong>Col\u00f3n<\/strong> and the other in <strong>Panama City<\/strong>, to which materials from the Canal were directly transferred.<\/p>\n\n<p>This project marked the <strong>beginning of Movilex&#8217;s permanent establishment in Panama<\/strong>, leading to the plant that operates stably in the country today.<\/p>\n","protected":false},"featured_media":0,"template":"","class_list":["post-48436","proyectos","type-proyectos","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/proyectos\/48436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:attachment":[{"href":"https:\/\/movilex.es\/en\/wp-json\/wp\/v2\/media?parent=48436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}